In a recent project on a large, densely populated island, DEPCOM modeled 15 different battery systems with varying technologies and multiple system configurations against local requirements to save millions in avoided augmentation, replacement and installation costs.
[pdf] Nova Power & Gas, a Romanian energy company and part of the E-INFRA group, announces the start of the largest battery storage project in Romania. The facility, to be built in Florești, Cluj County, will have a capacity of 200 MW / 400 MWh and will be operational by the end of 2025.
[pdf] SINEXCEL and Wasion Energy have announced the commissioning of the Coopesantos Wind Power Energy Storage System, a new grid-connected facility located in Costa Rica. The project is reported to be the first in Central America to feature SINEXCEL’s 1250kW energy storage inverter (PCS).
[pdf]