This project — a collaboration between the Rwandan government, Hakan Madencilik, and Energy Solutions — will meet the electricity needs of over 300,000 households and support the country’s goal of achieving 100% electrification by 2024.
[pdf] The company is a leader in ultrahigh-voltage direct current and voltage source converter–high-voltage direct current (HVDC). With a grid spanning 2,000 kilometres, CSG is connected to hydro, coal, nuclear, gas, wind, solar, biomass, pumped storage and new energy storage power sources.
[pdf] The auction aims to boost Brazil’s grid reliability by integrating energy storage for wind and solar power. Credit: r.classen/Shutterstock. Brazil is set to conduct its first auction for adding batteries and storage systems to the national power grid, as reported by Reuters.
[pdf]